Page 1 of 1

Two Pulsar 2's and delivery time to UK from Sonic-Core

Posted: Wed Mar 05, 2008 2:27 am
by Strattosphere
Hi Gang

I've just bought a second Pulsar 2 from a nice chap in Beaconsfield. I just need to get one or two STDM cables now.

If I plug in both cards, obviously without an STDM cable currently, I get no clock sync. Is that to be expected without the cable? Individually the cards are fine.

Have any UK users out there ever ordered an STDM cable directly from Sonic-Core? If so, did you use the German Postal Service (cheap!) and how long did it take to arrive?

Thanks

Stratt

Posted: Wed Mar 05, 2008 7:51 am
by Tau
I did order some STDM cables from SC, to Portugal. Took about 4 days and was quite cheap...

T

Posted: Wed Mar 05, 2008 8:28 am
by hubird
you can make one, the parts are to get in electronica shops (20 pin connector to fit on the card's side).

Posted: Wed Mar 05, 2008 8:34 am
by kylie
hubird wrote:you can make one, the parts are to get in electronica shops (20 pin connector to fit on the card's side).
does that apply to the all-new XTDM cables, too? :)
the connector looks either like DVI or sub-d 25 (I assume the latter).

damn, I want hi-res picture...

Posted: Thu Mar 06, 2008 5:19 am
by Strattosphere
Blimey, that was quick. I ordered two S/TDM cables from Sonic Core on Monday evening and they've arrived today. Not bad for €23 inc postage to the UK.

Stratt :)